June 28, 2002--Looking into the atrium from Level 1: A large crane lifts steel beams to the roof where iron workers attach them to form the superstructure which will cap the atrium.

June 28, 2002--Looking into the atrium from Level 2: Workers wear the tools they need in their belts and change the tie-off point of their tethers as they move across the work area.

June 28, 2002--Level 3: A steel column set in the center of the atrium forms the core of a "tree" which will be a focal point of the Cybercafé. The top of the column is seen here through the south window of the Level 3 reading room.

June 28, 2002--southeast of Olin: Two levels below the main level, carpenters create a work area where they can assemble sections of a form for pouring concrete. Besides using scaffolding and ladders, they build a bridge to reach the area.

June 28, 2002--southeast of Olin: Concrete will be poured between the sides of the form. After the concrete sets, the form is removed and the reinforced vertical shaft is complete and ready for ductwork

List of Photos by month

PREVIOUS PAGE

NEXT PAGE

Comments & Questions
Renovation Home Page

Last updated: Variable 'LAST_MODIFIED' cannot be evaluated

Page maintained by: renovation@library.wustl.edu
© 2001 Washington University Libraries