June 25, 2002--southeast of Olin: The renovation plan requires digging a second airshaft. An excavator digs deep and lays dirt on the ridge of the hole. Another excavator scoops it up, backs out carefully to avoid the columns, and then dumps the dirt into a waiting truck. |
|
![]() |
|
June 25, 2002--east of Olin on Level 2: Demolition workers strip off metal sheeting from the edge and then chip away a layer of concrete from the overhang. Debris is wheeled to the edge of the overhang on the west side and tipped into a dumpster. |
|
![]() |
|
June 25, 2002--north of Olin: Three glaziers install a metal grid designed to hold glass panels. Some sections of the grid arrive pre-cut, then the glaziers must assemble them together and fit them into the available space. |
|
![]() |
|
June 25, 2002--north of Olin: A glazier pushes rubber gasket into a channel in the metal grid. The gasket will cushion the glass panels and seal out weather. |
|
| List of Photos by month | |
PREVIOUS PAGE |
NEXT PAGE |
|
Comments & Questions Last updated:
Variable 'LAST_MODIFIED' cannot be evaluated |
|