May 28, 2002--Level 1: Because of the construction fence, the automatic door into Olin was closed and a different door was identified as the new location for the automatic opener. A door installer prepares for the conversion by installing mechanical components to the door and the entry. To complete the installation, electronic components will be installed and electrical power will be routed to the doors.

May 28, 2002--Level 1: Formerly storage closets in offices and in restrooms, these spaces have been converted to electrical closets on each level. A mason bricks up the former doorways with concrete blocks which weigh 36 pounds each.