Olin Renovation in Pictures
page 69

PREVIOUS PAGE NEXT PAGE

Close-up: Electricians take on a variety of tasks to complete Level B. Here are a few close-ups:

April 1, 2002--Level B: An electrician connects wiring in flexible conduit to a junction box.

April 1, 2002--Level B: An electrician closes a clamp holding conduit on the ceiling of the Libraries' Business Office on Level B.

April 1, 2002--Level B: An electrician installs a tray for carrying telecommunication wires above the ceiling of the shipping/supply room of Olin Library.

April 1, 2002 -- Level B: Ceiling in the hallway of staff area of Level B is thick with pipes and conduit.

April 1, 2002--Level B: Two carpenters, atop scaffolding, install sheetrock in a staff office.