Olin Renovation in Pictures
page 6

PREVIOUS PAGE NEXT PAGE

plastic tunnel
May 31, 2001--Level B: Plastic sheeting seals off the area where demolition of masonry walls produces dust and grit.

duct tape
May 31, 2001--Level B: Using a universal tool -- duct tape -- these workers prepare a frame for the plastic sheeting.

furniture stacked
May 31, 2001--Level B: Furniture from the faculty carrels is stacked together awaiting shipment to a consigner.

empty south side of Level B
May 31, 2001--Level B: The south half of Level B is completely cleared of shelving.

uprights are packed
May 31, 2001--Level B: A two-man team unbolts the footings and pushes them from the uprights before they are stacked and packed.