Olin Renovation in Pictures
page 245

PREVIOUS PAGE NEXT PAGE

man working overhead as people walk past the library
April 21, 2004--south of Olin: On the exterior of Level 3, a worker in a powered lift loosens dirt from the limestone façade with a power sprayer.

close-up of man in cab of lift scrubing with broom
April 21, 2004--south of Olin: After loosening the dirt, the worker scrubs the louvers of the limestone brise soleil with a broom and cleaning solution before rinsing it again.

looking up at the building sign and a new tree in foreground
April 27, 2004--south of Olin: After a deep cleaning, the limestone from the old façade blends well with the new limestone of the sign. Landscaping includes new trees in front of Olin to shade the plaza.

one man on ladder and one man on stair landing with extension pole clean windows
April 27, 2004--Level 1: Workers scrub the windows surrounding the grand staircase as part of a project where every window, inside and outside of Olin was cleaned.

view into cafe from the front door
April 27, 2004--Level 1, café: Workers finish up construction tasks and begin moving out their equipment this week as furniture and bench installation begins tomorrow.

List of Photos by month
PREVIOUS PAGE

NEXT PAGE

Comments & Questions
Renovation Home Page

Last updated: Variable 'LAST_MODIFIED' cannot be evaluated

Page maintained by: renovation@library.wustl.edu
© 2001 Washington University Libraries