August 8, 2001--Level B: With most of the demolition completed on Level B, sheet metal workers install new ductwork before the sprinkler fitters begin their work.

tie to water main
August 8, 2001--east lawn of Olin: Contractors, subcontractors, and university liaisons meet to confirm the location of a connection between the water main and the new fire sprinkler feed.

tie to water main MORE digging
August 8, 2001--east lawn of Olin: While the mini-excavator moves large scoops of dirt, hand shovels are best used near pipes.

tie to water main
August 9, 2001--east lawn of Olin: Granite blocks from the decorative walk around Olin stack neatly to the left as the digging continues for the new fire sprinkler tie-in to the water main.

tight space for jack hammering
August 9, 2001--north wall outside Olin: The mini-excavator/breaker is small-sized equipment just right for the tight space on the north side.

List of Photos by month

PREVIOUS PAGE

NEXT PAGE

Comments & Questions
Renovation Home Page

Last updated: Variable 'LAST_MODIFIED' cannot be evaluated

Page maintained by: renovation@library.wustl.edu
© 2001 Washington University Libraries