November 21, 2002--Level A: A bricklayer taps burrs off of the edge of a slab of limestone with a chisel-backed hammer. The limestone is installed around the elevator entry and matches other limestone finishes in the lobby.

November 21, 2002--Level A: To install limestone facing above the elevator, a bricklayer slathers mortar on the wall.

November 21, 2002--Level A: Walking beneath a drywall joint, a drywall finisher presses a 10" spreader against the ceiling and leaves a smooth layer of joint compound.

November 21, 2002--Level A: One crew member scrapes the concrete floor to loosen debris while another sweeps in preparation for carpet installation. At right, on scaffolding, a drywall finisher applies joint compound to seams on the ceiling soffit.

November 21, 2002--Level A: A floor layer spreads mastic where two carpet sections meet. Additional shelving will fill the non-carpeted areas.

List of Photos by month

PREVIOUS PAGE

NEXT PAGE

Comments & Questions
Renovation Home Page

Last updated: Variable 'LAST_MODIFIED' cannot be evaluated

Page maintained by: renovation@library.wustl.edu
© 2001 Washington University Libraries