Olin Renovation in Pictures
|
|
| PREVIOUS PAGE | NEXT PAGE |
![]() |
|
November 6, 2002--Level 1: Formerly offices for administrative staff, this space will house the Special Collections after it is renovated. Plumbers (far left) install new sanitary water pipes, while pipe fitters (center front) drain old heating pipes at the ceiling before removing them. Electricians (center back) have begun to install wire conduit, while glaziers continue to caulk and seal the glass outer wall. |
|
![]() |
|
November 6, 2002--Level 1, Atrium: On the power lift, a worker smooths off the concrete ledge of Level 2 with a jackhammer and spade. Below carpenters build wood forms, while those above start to install the forms where concrete will be poured for a new ledge. |
|
![]() |
|
November 6, 2002--south of Olin: Like the underpass walls leading to the South Forty complex, the construction walls around Olin are host to announcements painted by student groups. |
|
![]() |
|
November 12, 2002--Level A: The main north-south aisle is filled with materials for drywall workers, carpenters, and painters as they focus on the carrels along the north wall. The ceiling is painted white to reflect the light and increase overall illumination in the stacks. |
|
![]() |
|
November 12, 2002--Level A: A drop ceiling extends over the main east-west aisle; above the ceiling is space for telecommunications wire. Wireless and wired computing is available in many areas, including the study rooms and carrels, on each renovated level. |
|
![]() |
|
November 12, 2002--Level A: In the open study area on the east edge of Level A, an electrician weaves flexible conduit above the framework for the drop ceiling. |
|