Olin Renovation in Pictures
page 127

PREVIOUS PAGE NEXT PAGE

October 30, 2002--Olin Renovation: The ladder of success: glaziers, sheet metal workers, sprinkler fitters, electricians, and painters were photographed using ladders simultaneously on October 30. Some of the photos appear below:

 
October 30, 2002--Northeast of Olin: Glaziers clean surfaces with 91% isopropyl alcohol before caulking and sealing the glass wall.

October 30, 2002--Level A: A sheet metal worker installs a fire damper in the ductwork that passes through the wall shaft behind the restrooms, The damper screen is held by a lead strip which melts when heated to 160 degrees and releases the damper.

October 30, 2002--Level A: With their heads disappearing into the spaghetti of fixtures already near the ceiling, two electricians affix wire conduit to the concrete. Wiring projects include fire sensors, telecommunication lines, additional lighting.

October 30, 2002--Level A, Arc (Technology Center): Two electricians install light fixtures in the Arc. The Technology Center is named the Arc for its sleek architectural design featuring a curvilinear wall covered in rich wood paneling.

October 30, 2002--Level A, Arc (Technology Center): With a very narrow gap between the concrete ceiling and the hanging ceiling tiles, a team of electricians plan how to dodge other installations and where to route conduit.

List of Photos by month

PREVIOUS PAGE

NEXT PAGE

Comments & Questions
Renovation Home Page

Last updated: Variable 'LAST_MODIFIED' cannot be evaluated

Page maintained by: renovation@library.wustl.edu
© 2001 Washington University Libraries