Olin Renovation in Pictures
|
|
| PREVIOUS PAGE | NEXT PAGE |
![]() |
|
September 4, 2002--north of Olin: Working outside the new north wall of Olin, two glaziers climb ladders in tandem to mount long strips of molding over the outer edges of the glass panels. |
|
![]() |
|
September 4, 2002--north of Olin: A laborer (blue jeans) delivers an armload of lumber to a workbench outside of the northeast stairway. Carpenters (white jeans) nail up a temporary wall across the stairway and frame in offices as temporary quarters for library staff during the renovation of Level 1. |
|
![]() |
|
September 4, 2002--southeast of Olin: After fabricating a section of metal grid wall for the Cybercafe, two glaziers transfer the grid from the workbench to a pile awaiting installation. |
|
![]() |
|
September 4, 2002--east of Olin: A demolition team dismantles what used to be the alcove next to the main entrance which previously housed the public and campus phones and a drinking fountain. |
|
![]() |
|
September 10, 2002--souteast of Olin: One electrician hoists a gear box while another lies next to the base to threads wires through openings. They are preparing the gear boxes for installation on Level A at 5 am tomorrow morning. |
|